Saturday, September 27, 2014

OH SHIT (literally)

So we found the switch to empty the toilet, so we stuck a bucket under the pipe and pulled....There was no need for the bucket, because the toilet was so full it flooded the bucket and our driveway. Sorry drought but I'm going to waste water rinsing away "waste". So gross. I have no idea why the person before the lady we bought it from didn't decided to empty but you sir-ma'am are a asshole. It was soooooo nasty. That being said we managed to get a crowbar and wedge the toilet up from the floor and threw it out. Then I got my happy ass in there and pulled all the paneling out of the bathroom.

I am over joyed at this point because that was the end of the paneling. No more working on pulling fiberglass and paneling out. Now we need to work on the wiring. The husband and the brother-in-law are going to try to handle that in a couple of weeks (yay zombie ball is the coming weekend and ren fair the day after), and my uncle who is a electrician is going to check it out when it's done to make sure we wont burst into flames.

Then new foam insulation sheets and new paneling. Then we will work on getting the top bunk back in.

I am so unbelievably happy that the weather cooperated today and we were able to get everything pulled out. I never want to work on paneling again!

Anyways i got it all swept out and took some pictures for you guys.









 :)