Monday, May 26, 2014

Slow goin on the lo-liner (here by name The Berserker)

It is a solid 95 here in Visalia today, which mean inside the trailer is probably at the least 100 degrees. So as far as work went we did very little. My husband  and I managed to take out one of the shelves, which was more of a project then we anticipated since the screws where stripped. i also got the door jam thing ripped out, and part of the wall paneling ripped out, there is some water damage and mold on the of the support beams around one of the windows which hopefully will be a easy replace.
 So I got this far when I realized that I might need to cover my face, and i should google what asbestos looks like. And it wasn't, but after the epic battle getting that middle shelf out there was dust and random spare change everywhere so i cover up with a bandanna.
Then thats when the man child tried to get into the trailer and instead of asking for help, he just f-ing lost his S**t.
So i had to take a a break to comfort him, while my husband thought it was hilarious and took pictures and videos. After that adventure, the men folk went inside while i got busy ripping out that part of the paneling.
Thats where the water damage and mold ate at the wooden beams. But it only looks like two need to be replaced. We will also reseal the window and make sure no leaks happen.
Random selfie. 

This is where I stopped working, cause I'm pretty sure I started to melt.
Water damage in the corner.
Which means we will have to take this whole shelf down to replace the paneling and seal any openings.
My mess by the end of it.


No comments:

Post a Comment